A bathroom is the smallest room in the house and the one most likely to cause damage when it is built wrong. Almost all of that comes down to water.
The Failure Mode Is Always Water
Bathrooms fail in a predictable way. Water gets past the tile, sits in the assembly behind it, and the first visible sign is a stain on a ceiling below or a soft spot at the base of the shower. By then the framing and subfloor have usually been wet for a long time.
Tile is not waterproof. Grout is not waterproof. The waterproofing is a layer behind the tile that nobody ever sees, and it is the single most important part of a bathroom. It is also the easiest place to save money if the finish is all anyone is going to inspect.
Praxis Building Group builds bathrooms around that assembly first. The tile pattern matters, but it matters after the shower is built to actually contain water for decades.
Typical Project Scope
Bathroom projects range from a surface refresh to a full rebuild. A typical full bathroom scope includes:
- Demolition to the studs and subfloor, with dust containment and floor protection
- Inspection of framing and subfloor for existing water damage
- Framing corrections, blocking for grab bars, niches and wall mounted fixtures
- Plumbing rough in: supply lines, drain and vent, shower valve, fixture locations
- Electrical: GFCI protection, lighting, exhaust fan circuit, heated floor supply where used
- Exhaust ventilation ducted to the exterior, correctly sized for the room
- Waterproofing of the shower or tub surround and wet floor areas
- Backer board, mortar bed or pan assembly as the design requires
- Tile setting, including floor, walls, niches, curbs and thresholds
- Drywall, priming and painting with a finish appropriate to a wet room
- Vanity, top, mirror, lighting and accessory installation
- Fixture trim out, door, hardware and punch list
Not every project includes every item. Scope is written for your specific house and stated plainly before pricing.
The Praxis Building Group Approach
Waterproofing is a decision, not a default
There are several legitimate ways to build a waterproof shower: sheet membranes, liquid applied membranes, foam board systems, or a traditional mortar bed with a pan liner. They are not interchangeable and they cannot be mixed carelessly. We pick a system for the specific shower and install it as the manufacturer specifies rather than combining pieces of several.
Blocking goes in before drywall
Grab bars, floating vanities, wall mounted faucets, shower doors, niches and benches all need solid backing. Adding blocking costs almost nothing while the wall is open. Adding support after tile is set means taking tile off. We install blocking for anything the design might reasonably need, including grab bars a homeowner may want later.
Ventilation sized for the room
An undersized or improperly ducted exhaust fan puts moisture into the structure instead of outside. Ducting into an attic or soffit rather than through the roof or wall is a common defect found during demolition. We correct it rather than reconnecting to it.
Layout changes are a plumbing question
Moving a toilet means moving a drain, which means opening the floor and working within joist direction and the limits on notching and boring. Moving a shower is usually easier than moving a toilet. Praxis Building Group will tell you which layout changes are straightforward and which ones are structural work in disguise.
Construction Considerations
Tub to shower conversions
Converting a tub to a walk in shower is one of the most common bathroom requests, and one of the most worthwhile. The considerations are drain relocation, curb or curbless entry, floor slope, glass support and whether the house still has a bathtub somewhere. A curbless shower is achievable in most homes but usually requires recessing the framing, which depends on joist direction and depth.
Second floor bathrooms
A second floor bathroom leaks into a finished ceiling. That raises the stakes on waterproofing and makes access to the drain assembly harder. Where a ceiling below has to be opened for drain work, it is better to plan for it than to discover it.
Older homes and drain venting
Bathrooms in older Southeast Michigan homes frequently have drain and vent arrangements that were acceptable when installed and are not now. Once a bathroom is opened and permitted, that work generally has to be brought current. It is better to know that at the scope stage.
Heated floors
Electric floor heat is a reasonable addition during a tile floor replacement and effectively impossible to add afterward. It needs a dedicated circuit and a thermostat location decided during rough in.
Planning This Project
Bathroom scope divides cleanly at one question: does the layout move. A bathroom that keeps its fixture locations and replaces everything visible is a shorter, more predictable project. A bathroom that relocates the toilet or converts a tub to a curbless shower involves drain work and floor framing.
Tile selection should be finished before demolition. Tile size and pattern affect layout, waste factor, substrate flatness requirements and setting time. A late change from a small mosaic to a large format tile can change what the wall preparation needs to be.
Questions
Questions About Bathroom Remodeling
How long is a bathroom out of service?
A full bathroom rebuild is typically a multi week project, and the room is unusable for essentially all of it. The schedule is driven less by labor hours than by required sequence: rough in, inspection, waterproofing, cure times, tile setting, grout cure, then trim out. Those waits are not padding and they cannot be compressed without compromising the work.
Can you convert my tub to a walk in shower?
Yes, and it is one of the most common projects we perform. The main variables are whether the drain has to move, whether you want a curb or a curbless entry, and whether the house retains a bathtub elsewhere. Curbless entries usually require recessing the floor framing, which depends on the direction and depth of the joists below.
What is behind the tile in one of our showers?
A dedicated waterproofing system, installed as a complete assembly rather than assembled from parts of several. Depending on the shower that may be a sheet membrane, a liquid applied membrane or a foam board system, over properly prepared framing with blocking where the design needs it. Praxis Building Group will tell you which system your shower is getting and why.
We found water damage during demolition. What happens?
It gets documented, the extent gets determined, and you get a price for the correction before it is performed. Hidden water damage at the shower base, the toilet flange or an exterior wall is the most common discovery in bathroom work, which is why a contingency belongs in a bathroom budget. Covering it back up is not an option we offer.
Often part of the same job
Related Services
Where we work
Southeast Michigan Service Area
Praxis Building Group works throughout Southeast Michigan from two bases: Highland in Oakland County and Ann Arbor in Washtenaw County.
Location Pages
Counties Served
- Oakland County
- Washtenaw County
- Livingston County
- Western Wayne County
Also Serving
Consultation
Planning a Project? Start With Praxis Building Group.
Whether it is one room or a whole house, the first conversation is the same: what you want to change, what the house will allow, and what it realistically takes to get there. Send the details or call and we will set up a consultation.
- Call 833-637-8466
- Project inquiries sales@praxisbg.com
- General questions info@praxisbg.com
- Serving Highland & Ann Arbor, Michigan
Start Your Project
Tell us what you are planning. Praxis Building Group will follow up to talk through scope, sequencing and a realistic budget range before anything is committed.
Your inquiry is on its way
Thank you for contacting Praxis Building Group. We review every inquiry and follow up to schedule a consultation and walk the project.
If you need to reach us sooner, call 833-637-8466 or email sales@praxisbg.com.