Whole Home Renovation
Multi room and full house renovations where walls move, systems get replaced and every trade has to be sequenced.
Highland, Michigan
Praxis Building Group works from Highland, covering western Oakland County and the lake communities around it.
Highland is one of the two places Praxis Building Group works from, which means most of western Oakland County is a short drive rather than a scheduling problem. That matters more than it sounds. Projects that need a trade back on site for half a day, or a contractor to look at something the same afternoon, run differently when the company is not driving in from another county.
The work here spans a wide range because the housing does. Highland Township and the communities around it contain lake cottages, 1970s and 1980s subdivisions, rural parcels with acreage, and newer construction, sometimes within a mile of each other.
Several distinct types of house show up repeatedly in this area, and each brings its own set of construction questions.
Lake properties are the most distinctive. Many homes around the lakes in and near Highland began as seasonal cottages and were converted to year round use over decades, often in stages and often without permits. Those houses frequently have mixed foundation types, additions framed to different standards, undersized electrical service, insulation added piecemeal, and floor levels that step where one era met another. They also tend to sit on small lots with difficult access and significant grade change to the water.
Subdivision homes from the 1970s through the 1990s are the second common type. Structurally these are straightforward. What they usually need is updating: kitchens and bathrooms that are original, basements never finished, aging roofs and siding, and electrical that predates the load a modern household puts on it.
Rural acreage parcels make up the third group. These bring well and septic considerations, longer utility runs, and the outbuilding work that comes with having land: detached garages, pole style buildings and workshops.
Western Oakland County sits on rolling glacial terrain, and the practical consequences show up in construction planning.
Grade change is common. A lot that slopes toward a lake or a low area affects where water goes, whether a basement is a walkout, how a driveway is laid out, and where an addition can reasonably be placed. Drainage planning is rarely optional here.
Wetlands and lake frontage add a regulatory layer. Work near water or in a regulated wetland may require review beyond the local building department, and that review has its own timeline. It is far better to establish this before design than to discover it during permitting.
Outside limited service areas, much of the township is on private well and septic. Septic field location constrains where an addition or detached structure can sit, and adding bedrooms can raise septic capacity questions. Septic permitting in Oakland County goes through the county health division rather than the township building department, which means two separate processes on some projects.
Whole home renovation of converted lake cottages, where the goal is usually to unify a house that grew in stages: consistent floor levels, adequate electrical service, real insulation, and a plan that makes sense as one house rather than three.
Walkout and daylight basement finishing, which the terrain makes common. These are among the better value projects in the area because the grade already provides the windows and the light.
Detached garages, pole buildings and workshops on acreage parcels, including structures that need power, heat and finished interior space rather than bare storage.
Additions on subdivision homes, where the constraints are usually setbacks, septic field location and matching an exterior from a specific decade.
Roofing and siding replacement, including the correction of ventilation and flashing details that shorten the life of the previous installation.
Building permits in Highland Township are issued locally, and requirements vary from neighboring jurisdictions in the specifics of what documentation is expected. Structural work, additions and new structures generally require drawings and often engineering. Electrical, plumbing and mechanical work typically carry separate permits and inspections.
Septic and well permitting in Oakland County is handled through the county health division. On rural parcels this is a genuinely separate process with its own review time, and it can determine what a project is allowed to be.
We handle permitting as part of preconstruction. The relevant point for planning is that a rural parcel project with a septic component has a longer approval path than a bathroom remodel in a subdivision, and the schedule should reflect that from the start.
Common here
Every service we offer is available in Highland. These are the ones that come up most often given the local housing stock and site conditions.
Multi room and full house renovations where walls move, systems get replaced and every trade has to be sequenced.
Unfinished basements turned into living space, with the moisture, egress and mechanical work done in the right order.
Detached garages, pole style buildings and outbuildings, from slab and footings through doors, power and finishes.
Adding square footage: foundation, framing, roof tie in, systems extension and finishes that match the existing house.
Tear offs, re roofs and roofing that is part of a larger project, including decking repair, ventilation and flashing details.
Layout changes, cabinetry, counters, lighting and the electrical and plumbing work behind them, handled as one job.
Questions
Regularly. Converted cottages are one of the most common project types in this area, and they have a recognizable set of conditions: staged additions framed to different standards, mixed foundations, undersized electrical service, and floors that step between eras. Praxis Building Group approaches those as whole house planning problems rather than as a series of room remodels.
Yes. Detached garages, post frame buildings and workshops are regular work on acreage parcels in this area. The first questions are zoning limits on accessory structure size and height, setbacks, and where the septic field is, since that often determines placement more than preference does.
In two ways. Physically, the field and its replacement area constrain where a foundation can go. Regulatorily, adding bedrooms can raise questions about whether the existing system is sized for the house. Septic permitting in Oakland County runs through the county health division separately from the township building permit, so it belongs early in the schedule.
Highland is one of the two locations we operate from. The other is Ann Arbor. Both are the same company, the same phone number and the same contracts.
Nearby
Praxis Building Group covers the communities around Highland from the same base. Dedicated pages for these markets are being added.
Consultation
Whether it is one room or a whole house, the first conversation is the same: what you want to change, what the house will allow, and what it realistically takes to get there. Send the details or call and we will set up a consultation.
Tell us what you are planning. Praxis Building Group will follow up to talk through scope, sequencing and a realistic budget range before anything is committed.
Thank you for contacting Praxis Building Group. We review every inquiry and follow up to schedule a consultation and walk the project.
If you need to reach us sooner, call 833-637-8466 or email sales@praxisbg.com.